EV Charger Installation in Beverly Hills
Installing a Level 2 EV charger means confirming your panel can handle the continuous load, and in Beverly Hills that question is often about installing two or more chargers at once rather than a single unit, frequently inside a subterranean parking garage that needs its own conduit routing. Multi-vehicle households here are common enough that dual-charger installs are a routine request.
You’re in good hands. Our team will follow up promptly.
Why Multi-Charger Installs Are Common Here
A property with 400A residential service has meaningfully more headroom than a standard 200A home, which makes running two independent 60A circuits for simultaneous EV charging straightforward from a capacity standpoint. The harder part is usually the physical routing, subterranean garages often need conduit suspended from slab drop hangers rather than a simple wall run.
Getting the load calculation right upfront means both chargers can run at full output at the same time without voltage drop, which matters more here than on a single-charger residential install.
What an EV Charger Installation Includes
- Load calculation confirming the panel can support one or multiple simultaneous chargers
- Conduit routing suited to subterranean garages, including slab-suspended runs where needed
- Independent dedicated circuits for each charger to avoid shared-load limitations
- Verification of voltage and ground resistance under simultaneous full load
For the general installation process and charger types, see our EV Charger Installation service page. This page focuses specifically on what that looks like in Beverly Hills.
FOR HOMEOWNERS
A Recent Beverly Hills EV Charger Install: What We Did
A homeowner in Beverly Hills needed two Level 2 EV charging docks mounted inside a subterranean parking garage. We conducted load calculations on the residence’s 400A service, confirming adequate capacity for dual continuous 48A draws.
The installation used 1-inch rigid steel conduit installed overhead, suspended from slab drop hangers, with #6 AWG copper conductors pulled for two independent 60A circuits, terminating at dual hardwired Level 2 smart charging docks.
Both chargers were tested under load simultaneously, operating at full capacity without any voltage drop between them, confirming the load calculation held under real-world conditions.
If your panel turns out not to have the headroom for a project like this, our Panel Upgrade in Beverly Hills page covers what that process looks like.
EV Charger Installation Pricing in Beverly Hills
| Charger Type | Starting Price | Notes |
|---|---|---|
| Level 1 charger setup | From $300 | Internal pricing sheet rate |
| Level 2 charger installation (single unit) | From $400 | Internal pricing sheet rate |
| Multi-charger / subterranean garage install | Quoted per project | Scope-dependent on conduit routing and number of units |
Final pricing depends on site conditions, materials, and permit requirements. Call for a free on-site estimate.
What Beverly Hills Customers Say
“Superb attention to detail. Smoothly executed Ev Charger Installation. So glad we hired them in Beverly Hills. Great communication.”
— Gabriel P.
“Great experience. They rapidly absolutely managed our Ev Charger Installation right here in Beverly Hills. Very respectful.”
— David M.
Serving Beverly Hills and Nearby Los Angeles County
For general information about our coverage of this city, see our Beverly Hills service page, or visit the Los Angeles County hub.
Common Questions About EV Charger Installation in Beverly Hills
Can you install more than one charger at once?
Yes, dual and even triple-charger installs are common in Beverly Hills; we run the load calculation to confirm your panel’s capacity handles them all running simultaneously.
Do subterranean garages need special conduit routing?
Often yes, we typically install conduit suspended overhead from slab drop hangers in subterranean garages rather than a standard wall-mounted run.
Will running two chargers at once cause voltage drop?
Not if the load calculation and circuit sizing are done correctly upfront, which is exactly what we verify before installation and confirm under load afterward.
How long does a multi-charger installation take?
A dual-charger subterranean install typically takes a full day, longer than a standard single-charger residential install.
For company-level questions, see our general FAQ.
Scchedule Your Service Today
Tell us what you need, and our team will get in touch to discuss your project and
help you take the next step.
You’re in good hands. Our team will follow up promptly.